Search


Information
ICMST-Tohoku 2018
Oct. 23 - 26, 2018
Sendai, Japan
ICMST-Shenzhen 2016
Nov 1 - 4, 2016
Shenzhen, China
(EXIT THIS PAGE)
ICMST-Kobe 2014
Nov 2(Sun) - 5(Wed), 2014
Kobe, Japan
Nuclear Regulation Authority Outline of the New Safety Standards for Light Water Reactors for Electric Power Generation
For Public Comment
Outline of New Safety Standard (Design Basis)
For Public Comment
New Safety Standards (SA) Outline (Draft)
For Public Comment
Outline of New Safety Standard(Earthquake and Tsunami)(DRAFT)
Issues
 

Vol.10 No.2(Aug)
Vol.10 No.1(May)
Vol.9 No.4(Feb)
Vol.9 No.3(Nov)

< Other Issues

 

Occasional Topics
OTjapan Measures for Tsunami Striking Nuclear Power Station in Japan
Special Article: The Great Tohoku Earthquake (1)
OTjapan The Tragedy of “To Be” Principle in the Japanese Nuclear Industry
EJAMOT_CN3_Figure1_The_outside_view_of_CEFR OTChinaPlanning and Consideration on SFR R&D Activities in China
< All Occasional Topics

Featured Articles
EJAM7-3NT72 A New Mechanical Condition-based Maintenance Technology Using Instrumented Indentation Technique
EJAM7-3NT73 Survey robots for Fukushima Daiichi Nuclear Power Plant

JSM
Contacts
(EJAM): ejam@jsm.or.jp
(JSM): secretariat@jsm.or.jp
HP: http://www.jsm.or.jp
(in English)

 
GA 1 - 2 - 3 - 4 - AP 1 - 2 - 3 - 4 - 5 - NT 1 - 2 - 3 - 4 - 5 - 6Vol1.No.2
Academic Articles
(Invited Paper) Vol.1 (2009) p.30 - p.43
 
Research priorities at the European Commission in relation to Maintenance Optimisation and Nuclear Power Plant Life Management
 
Paolo CONTRI
 
European Commission, Joint Research Center's Institute for Energy
 
Abstract
Analysis of experience in many countries operating nuclear power plants (NPPs) suggests that, while differences in long term operation (LTO) programs are mainly related to the various national regulatory processes, the main features and basic technical requirements are similar.The implementation of these however needs reshaping in a an integrated plant life management (PLIM) framework, bearing in mind the specific safety implications of LTO. R&D is essential to support this process, not only for long term extrapolation of the component integrity and behaviour, but also for a proper maintenance system and for an adequate management structure ensuring effective management strategies at plant level, able to address organisational issues, spare part management, staff ageing, component obsolescence, etc. This is recognised by the European Commission, which supports R&D in targetted areas in the framework of the EURATOM programme, both by “direct actions” i.e. projects managed and executed by its Directorate General Joint Research Centers (JRC) and by indirect actions i.e. funding of selected projects, managed by the Directorate General Research (RTD). This paper outlines the JRC’s priorities in the current 7th Framework Programme in relation to R&D tasks for maintenance and ISI to support the highest safety level at member’s NPPs and appropriate decision-making tools for the optimisation of these programs. A newly developed UE model for PLIM, also inetgrating maintenance optimisation issues, is presented for further discussion.
 
Keywords
nuclear plants, maintenance, plant life mangement, research programs, European Union
 
Full Text: PDF
 
(Received: November 29th, 2008)